8 Servicin
g
BBW 46 / DBW 46
810
8.8 First Operation
After heater installation the coolant circuit and the fuel
supply system must be thoroughly bled observing
manufacturer's instructions. During the test run of the air
heater all coolant and fuel line connections are to be
checked for no leakage and tight fit. The coolant line
connections (20 - 27 mm Ø) are to be re-tightened with a
torque of 2.0 + 0.5 Nm. Should the heater during
operation enter an error lockout condition, perform
troubleshooting (see Section 5).
8.8.1 Bleeding the Fuel Supply System
After switch-on of the heater the dosing pump must first
prime the complete fuel supply system. Should the first
start attempt (incl. restart) not yet initiate combustion, the
heater must be switched off and on again (possibly
several times).
A completely empty fuel system may require - dependent
on the length of the fuel lines and the cycle frequency of
the dosing pump - in extreme cases up to 12 minutes
(approx. 50 sec per meter of fuel line with a line diameter
of d
i
= 2 mm).
Rapid priming of the fuel line may however be achieved as
follows:
connect the plus connection of the dosing pump to
+30 across a switch button (e.g. order no. 375.004)
(see Fig.)
continuously alternate switch-on and switch-off to
operate dosing pump until fuel line is primed.
CAUTION
Do not flood heater with fuel.
In case of an empty fuel line with a fuel tank completely
empty the heater should be started several times only with
the vehicle engine running to keep the load on the battery
to a minimum.
+30
8A
Fuse
Dosing pump Switch button